Back to Articles

Complete the following tasks to plan for installation.

Table 1. Planning phase checklist
TaskCompletedNotes
1. Determine system specifications, based on information found in Server or virtual machine requirements.
2. Construct Network Diagram.
4. If using an E6000 CMTS and polling DOCSIS 3.1 PNM data, confirm FTP or SFTP has been enabled on the CMTS.
5. If integrating ServAssure Collection Platform with ServAssure NXT Analyze, confirm you have configured the applicable site variables during installation of ServAssure Collection Platform. Refer to ServAssure® NXT Design and Installation Guide for more information.
6. Identify SMTP Servers.